Project Location: 3–5 Kingsland High Street, London E8
Project Type: Residential Retrofit
Services: MEP Design – MVHR, Hybrid Cooling & Fire Sprinkler System
Programme: 1–2 Weeks (Fast-Track Delivery)
Project Overview
InnoDez Engineering was appointed to deliver a fast-track MEP design for a residential retrofit project on Kingsland High Street, London. The existing building was originally configured as 13 flats and was reconfigured to 8 flats, requiring new building services to be carefully integrated into an existing structure with minimal disruption.
Client Challenge
The client required:
– A cost-effective retrofit solution
– Minimal breaking and opening-up to existing finishes
– Integration of MVHR with hybrid cooling
– A fully compliant fire sprinkler system
– Rapid turnaround to maintain the project programme
Our Solution
Our team developed a coordinated MEP design focused on practical routing, compact plant selection, and buildable detailing to reduce site disruption. Particular attention was given to:
– Efficient MVHR duct layouts suitable for retrofit conditions
– Hybrid cooling solutions compatible with the existing structure
– Fire sprinkler design aligned with UK fire safety requirements
– Clear, contractor-friendly drawings to support smooth installation
Fast-Track Delivery
Thanks to our responsive team structure and streamlined internal coordination, the full MEP design package was completed within 1–2 weeks, supporting the client’s tight programme and enabling the project to move forward without delay.
Outcome
✔ Fast-track delivery within 10 working days
✔ Cost-effective and low-disruption retrofit design
✔ UK Building Regulations–compliant MEP solution
✔ Practical, buildable drawings for site execution
This project highlights InnoDez Engineering’s ability to deliver high-quality retrofit MEP designs under accelerated timelines, particularly for constrained urban residential buildings.