Retrofit MEP Design – Kingsland High Street, London (E8)

Project Location: 3–5 Kingsland High Street, London E8 Project Type: Residential Retrofit Services: MEP Design – MVHR, Hybrid Cooling & Fire Sprinkler System Programme: 1–2 Weeks (Fast-Track Delivery) Project Overview InnoDez Engineering was appointed to deliver a fast-track MEP design for a residential retrofit project on Kingsland High Street, London. The existing building was originally […]

MEP Design for Restaurant Redecoration – Stage 4 Design

Location: 110 Cannon Street Sector: Hospitality / Restaurant Services: Mechanical, Electrical & Public Health (MEP) Design RIBA Stages: Concept (by others) → Stage 4 Technical Design (InnoDez) Project Overview This project involved the refurbishment and redecoration of an existing ground-floor restaurant within a commercial building at 110 Cannon Street in the City of London. The […]

Independent Pharmacy Fit-Out, Brent Cross Shopping Centre, London

Case Study 14: Independent Pharmacy Fit-Out, Brent Cross Shopping Centre, London Sector: Retail pharmacy Location: Brent Cross, London, England Size: 85 m² Status: Completed Q2 2022 Project overview InnoDez UK delivered a compact MEP engineering and energy package for an 85 m² pharmacy inside Brent Cross Shopping Centre. The brief called for quiet, stable environmental […]

Tech Repair & Accessories Store, Cabot Circus, Bristol

Case Study 13: Tech Repair & Accessories Store, Cabot Circus, Bristol Sector: Retail shop Location: Cabot Circus, Bristol, England Size: 75 m² Status: Completed Q2 2023 Project overview InnoDez UK delivered a compact MEP engineering and energy package for a 75 m² tech-repair and accessories unit at Cabot Circus. The concept relies on dense plug-in […]

Specialty Bakery Fit-Out, Battersea Power Station, Turbine Hall B, London

Case Study 12: Specialty Bakery Fit-Out, Battersea Power Station, Turbine Hall B, London Sector: Café and bakery Location: London, England Size: 90 m² Status: Completed Q3 2024 Project overview InnoDez UK delivered a fast-track MEP engineering and energy upgrade for a 90 m² specialty bakery inside Battersea Power Station, Turbine Hall B. Within strict heritage […]

Casual Restaurant Fit-Out, Manchester Arndale

Case Study 11: Casual Restaurant Fit-Out, Manchester Arndale Sector: Restaurant Location: Manchester, England Size: 125 m² Status: Completed Q4 2022 Project overview InnoDez UK delivered a focused MEP engineering and energy upgrade for a 125 m² casual dining unit inside Manchester Arndale. The team produced coordinated Mechanical, Electrical and Plumbing design and engineering that supports […]

Admin Office Suite Fit-Out, One Canada Square, Canary Wharf, London

Case Study 10: Optometry & Eye Clinic Fit-Out, Liverpool ONE Sector: Administrative office Location: Canary Wharf, London, England Size: 140 m² Status: Completed Q1 2025 Project overview InnoDez UK delivered a fast-track MEP engineering and energy upgrade for a 140 m² admin office on a multi-tenant floor at One Canada Square. The team produced coordinated […]

Fashion Retail Fit-Out, Westfield Stratford City, London

Case Study 9: Optometry & Eye Clinic Fit-Out, Liverpool ONE Sector: Retail shop Location: Westfield Stratford City, London, England Size: 80 m² Status: Completed Q3 2023 Project overview InnoDez UK delivered a focused MEP engineering and energy upgrade for an 80 m² fashion unit at Westfield Stratford City. Within tight landlord constraints and a shallow […]

Optometry & Eye Clinic Fit-Out, Liverpool ONE

Case Study 8: Optometry & Eye Clinic Fit-Out, Liverpool ONE Sector: Clinic Location: Liverpool, England Size: 110 m² Status: Completed Q4 2023 Project overview InnoDez UK delivered a concise Mechanical, Electrical and Plumbing design and engineering package with targeted energy upgrades for a new optometry clinic inside Liverpool ONE. The brief required quiet rooms, stable […]

Atrium Café Fit-Out, Bullring & Grand Central, Birmingham

Case Study 7: Atrium Café Fit-Out Sector: Food & beverage Location: Bullring, Birmingham, England Size: 95 m² Status: Completed Q2 2024 Project overview InnoDez UK delivered a fast-track MEP engineering and energy upgrade for a 95 m² café unit on the lower mall concourse at Bullring & Grand Central. Working within landlord constraints (no visible […]